Fabricators Clinic LLC emblemFabricators Clinic LLC
All insights

RFQ Guide · 2 min read

How to Prepare a Steel Detailing RFQ Package for Fast Review

What to send when requesting a steel detailing quote so the review can move quickly and assumptions are clear.

Send enough context for scope, not just a drawing cover page.

A good RFQ package should include structural drawings, architectural drawings if miscellaneous steel is involved, specifications, addenda, connection design notes, model files if available, bid forms, and any scope notes from the fabricator or contractor.

If the project is already in revision or field issue status, include the latest clouded drawings, RFI responses, photos, and the current question you need resolved.

The faster the scope is clear, the faster pricing can move.

Fabricators Clinic typically reviews complete RFQ packages within 24 hours. The review is used to identify missing information, clarify deliverables, flag unusual scope, and confirm the schedule before the project enters detailing or estimating production.

Have a project this applies to? Send us the drawings — we review every RFQ within 24 hours.